After installing the shower wall panel

Dec 31, 2025

Leave a message

After installing the shower wall panel, the following points should be noted:

 

1. Construction Quality Inspection

  • Check whether the wall panel is flat and vertical, and whether it is firmly in contact with the floor and ceiling.
  • The seams must be treated with grout or waterproof sealant to ensure a seamless and aesthetically pleasing finish.
  • After installation, maintenance is required for at least one week, during which knocking and vibration should be avoided.

 

2. Waterproofing and Moistureproofing Treatment

  • It is recommended to apply waterproof coating on the wallboard surface, and the joints with the floor and ceiling should be sealed.
  • The waterproof layer in the shower area should extend at least 1.8 meters above the floor.
  • Regularly inspect the waterproof performance to prevent moisture penetration.

 

126

 

3. Daily Cleaning and Maintenance

  • Clean regularly with a soft mop or vacuum cleaner, avoiding the use of acidic cleaning agents.
  • Clean surface stains promptly and keep it dry.
  • Avoid contact with sharp objects to prevent scratches.

 

4. Safety Protection

  • Select wall panel materials with high fire resistance ratings.
  • Keep away from open flames and power outlets.
  • Regularly check if the fasteners are loose.